top of page

factory Chitila
PROJECT SPECIFICATION
DESCRIPTION
The project consisted in building a factory on an area of 200 square meters. This structure was built in 24 hours. The destination of the project is the factory.
The metal structure used does not rust, using galvanized steel with FRAMECAD technology.
Location: Chitila
Surface: 200sqm
Year: 2016
Workers: 4
Galerie


bottom of page